AMERICAN ENERGY ATLAS
Industrial + power·Alabama

Sand Valley Landfill

Collinsville, Dekalb County, Alabama · TVA · operated by Energy Developments, Inc d/b/a EDL · owned by Republic Services Inc

2023 · headline year
Capacity in service4.8MW3 units · biomass
Net generation30.6GWh2023 · reported
CO₂ emitted48,467t2023 · reported to EPA · 3,765th highest of 6,030 in the US
Rank in Alabama#71of 75 · by capacity · #7,658 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor73%2023

Location

Dekalb County · TVA · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 319,021 MMBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 4.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GMA1.6Landfill gasLandfill Gas2013Operating
Unit GMB1.6Landfill gasLandfill Gas2013Operating
Unit GMC1.6Landfill gasLandfill Gas2013Operating

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Republic Services Inc · 100%
Operating utility
Energy Developments, Inc d/b/a EDL
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1006304
Balancing authority
TVA
NERC region
SERC
EIA plant ID
59710

Common questions

How big is Sand Valley Landfill?
4.8 MW across 3 generating units in service.
Who owns and operates it?
Owned by Republic Services Inc (100%) and operated by Energy Developments, Inc d/b/a EDL, filed as independent power producer.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Sand Valley Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much CO₂ does it emit?
48,467 t in 2023, reported to the EPA — the 3,765th highest of 6,030 US facilities that reported. Down from 227,900 t in 2011.

Related pages

Alabama energyAll facilities in the state→ANAD Solar Array7.4 MW operating capacity→ Point A5.2 MW operating capacity→ Albertville4.0 MW operating capacity→ Abc Coke3.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming