Salem, Essex County, Massachusetts · ISO-NE · operated by Salem Harbor Power Development LP · owned by Salem Harbor Power Development LP
2023 · headline year
Fuel spend$20.6M2023 · estimate
Capacity in service798MW4 units · gas
Net generation698GWh2023 · reported
CO₂ emitted278,894t2023 · reported to EPA · 1,285th highest of 6,030 in the US
Rank in Massachusetts#4of 666 · by capacity · #411 of 13,147 US
Reported suppliers22023 · 12 deliveries
Capacity factor10%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 5.41 TBtu · reported · $20.6M est.
CO₂ emitted, t · 2018–23
Reported (through 2023)
Generating units
4 of 4 shown · 798 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
240.7
Natural Gas
Natural Gas Fired Combined Cycle
2018
Operating
Unit 4
240.7
Natural Gas
Natural Gas Fired Combined Cycle
2018
Operating
Unit 1
158.4
Natural Gas
Natural Gas Fired Combined Cycle
2018
Operating
Unit 2
158.4
Natural Gas
Natural Gas Fired Combined Cycle
2018
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 61 deliveries recorded 2018–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Salem Harbor Power Development LP (100%) and operated by Salem Harbor Power Development LP, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2018. Every operating unit came online in 2018.
When is it due to retire?
No retirement date has been filed for any operating unit at Salem Harbor Station NGCC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $20.6M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
278,894 t in 2023, reported to the EPA — the 1,285th highest of 6,030 US facilities that reported. Down from 453,590 t in 2018.