AMERICAN ENERGY ATLAS
Industrial + power·Texas

Sabine River Operations

Orange, Orange County, Texas · MISO · operated by The Dow Chemical Company · owned by Dow Inc

2023 · headline year
Fuel spend$24.9M2023 · estimate
Capacity in service595MW4 units · gas
Net generation2.33TWh2023 · reported
CO₂ emitted908,296t2023 · reported to EPA · 640th highest of 6,030 in the US
Rank in Texas#72of 941 · by capacity · #592 of 13,147 US
Reported suppliers22023 · 24 deliveries
Capacity factor45%2023

Location

Orange County · MISO · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

97% Natural gas · 26.3 TBtu · reported · $24.9M est.3% Refinery gas · 0.748 TBtu · reported

Natural gas supplies 97% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 595 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GT1A180.0Natural GasNatural Gas Fired Combined Cycle2001Operating
Unit GT1B180.0Natural GasNatural Gas Fired Combined Cycle2001Operating
Unit ST1A145.0Natural GasNatural Gas Fired Combined Cycle2001Operating
Unit GEN189.9Natural GasNatural Gas Fired Combined Cycle1987Operating
Unit GEN36.2Natural GasNatural Gas Fired Combined Cycle1948Retired 2014
Unit GEN46.2Natural GasNatural Gas Fired Combined Cycle1948Retired 2008
Unit GEN23.1Natural GasNatural Gas Fired Combined Cycle1948Retired 1996

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Kinder MorganNatural gas17.3n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 264 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Dow Inc · 100%
Operating utility
The Dow Chemical Company
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Chemicals
EPA facility ID
1003382
Balancing authority
MISO
NERC region
SERC
Gas pipeline
Kinder Morgan Texas Pipeline LLC, Enterprise Texas Pipeline
EIA plant ID
10789

Common questions

How big is Sabine River Operations?
595 MW across 4 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Dow Inc (100%) and operated by The Dow Chemical Company, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1999. The oldest operating unit is Unit GEN1 (1987); the newest are Unit GT1A, Unit GT1B and Unit ST1A (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at Sabine River Operations. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas and refinery gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $24.9M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
908,296 t in 2023, reported to the EPA — the 640th highest of 6,030 US facilities that reported. Down from 986,381 t in 2011.

Related pages

Texas energyAll facilities in the state→Topaz Generating, LLC605 MW operating capacity→ Elk Station599 MW operating capacity→ Corpus Christi Energy Center593 MW operating capacity→ EXXONMOBIL Bt Site591 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming