AMERICAN ENERGY ATLAS
Power·Massachusetts

Ryan Road Solar LLC Hybrid(CSG)

Worcester County, Massachusetts · ISO-NE · operated by AES Distributed Energy

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service8.6MW2 units · storage + solar
Rank in Massachusetts#68 (tied)of 666 · by capacity · #5,842 (tied) of 13,147 US

Location

Worcester County · ISO-NE · NPCC

Generating units

2 of 2 shown · 8.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit BESS4.3StorageBatteries2021Operating
Unit ORCHA4.3SolarSolar Photovoltaic2021Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
AES Distributed Energy
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
63044

Common questions

How big is Ryan Road Solar LLC Hybrid(CSG)?
8.6 MW across 2 generating units in service — 4.3 MW of storage and 4.3 MW of solar.
Who owns and operates it?
Operated by AES Distributed Energy, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2021. Every operating unit came online in 2021.
When is it due to retire?
No retirement date has been filed for any operating unit at Ryan Road Solar LLC Hybrid(CSG). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (4.3 MW) and Solar Photovoltaic (4.3 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Massachusetts energyAll facilities in the state→Syncarpha Millbury Hybrid (CSG)8.8 MW operating capacity→ Auburn Solar Project8.7 MW operating capacity→ West Haydenville PJ Community Solar8.6 MW operating capacity→ High Street Station8.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming