Almanac › Missouri › Rush Island
By place
Power · Missouri
Rush Island
Festus, Jefferson County, Missouri · MISO · operated by Union Electric Co - (MO) · owned by Ameren Corp
Generating units retired 2024 2023 · headline year
Retired — its last generating unit went out of service in 2024, ending 1,242 MW of capacity, 98% coal by fuel energy in 2023.
Reported fuel cost $20.3M 2023 · reported deliveries
Retired capacity 1,242MW 2 units · none in service
CO₂ emitted 790,244t 2023 · reported to EPA · 723rd highest of 6,030 in the US
Rank in Missouri #18 of 98 · by reported CO₂ · #723 of 6,030 US
Location Jefferson County · MISO · SERC
What it burns 2023 · reported
Share of reported fuel consumption
98% Coal · 8.99 TBtu · reported2% Oil & petroleum · 0.138 TBtu · reported
Coal supplies 98% of the fuel energy it burned in 2023.
CO₂ emitted, Mt · 2011–2023
0 3 6 9 2011 2017 2023
Reported (through 2023)
Generating units 2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →
In the Atlas
Spend and volume trend 15 years
Suppliers and contracts 19 suppliers, 726 deliveries
Engineering record 2 boilers · 2 cooling systems · 2 particulate collectors · 2 control systems · 2 stacks
Monthly receipts 164 months
Open in the Atlas →
Ownership & operations
Operating utility Union Electric Co - (MO)
Entity type Investor-Owned Utility
Regulatory status Regulated
Industry sector Power Plants
EPA facility ID 1001035
Balancing authority MISO
NERC region SERC
EIA plant ID 6155
Common questions
How big is Rush Island? 1,242 MW across 2 units, none of which is in service — all retired.
Who owns and operates it? Owned by
Ameren Corp (100%) and operated by Union Electric Co - (MO), filed as investor-owned utility.
Which grid does it sell into? MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
When is it due to retire? It has already retired — the last unit retired in 2024 .
What does it burn, and where does the fuel come from? In 2023 it burned coal and oil & petroleum.
How much does it spend on fuel? Its fuel receipts report a delivered cost of $20.3M in 2023 .
How much CO₂ does it emit? 790,244 t in 2023 , reported to the EPA — the 723rd highest of 6,030 US facilities that reported. Down from 7.74 Mt in 2011.
Related pages
Select a state