AMERICAN ENERGY ATLAS
Power·Connecticut

Rocky River (CT)

Litchfield County, Connecticut · ISO-NE · operated by FirstLight Power Resources Services LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service31.0MW3 units · hydro
Rank in Connecticut#25of 168 · by capacity · #3,990 (tied) of 13,147 US

Location

Litchfield County · ISO-NE · NPCC

Generating units

3 of 3 shown · 31.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 324.0WaterHydroelectric Pumped Storage1928Operating
Unit 13.5WaterHydroelectric Pumped Storage1929Operating
Unit 23.5WaterHydroelectric Pumped Storage1928Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
FirstLight Power Resources Services LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
539

Common questions

How big is Rocky River (CT)?
31.0 MW across 3 generating units in service.
Who owns and operates it?
Operated by FirstLight Power Resources Services LLC, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1928. The oldest operating units are Unit 3 and Unit 2 (1928); the newest is Unit 1 (1929).
When is it due to retire?
No retirement date has been filed for any operating unit at Rocky River (CT). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Hydroelectric Pumped Storage (31.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (hydroelectric pumped storage) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Connecticut energyAll facilities in the state→DWW Solar ll36.9 MW operating capacity→ Kimberly-Clark Tissue Mill36.3 MW operating capacity→ Stevenson30.5 MW operating capacity→ Pratt & Whitney, East Hartford25.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming