Robeson County, North Carolina · CPLE · operated by AES Clean Energy
Capacity shown is planned or not in service
A planned 108 MW solar photovoltaic project, filed to come online in 2028.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit ROBES | 80.0 | Solar | Solar Photovoltaic | 2028 | Proposed |
| Unit ROBSS | 28.0 | Storage | Batteries | 2028 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit ROBES | new unit | 2028 | 80.0 MW |
| Unit ROBSS | new unit | 2028 | 28.0 MW |