AMERICAN ENERGY ATLAS
Power·Ohio

Robert P Mone

Convoy, Van Wert County, Ohio · PJM · operated by Buckeye Power, Inc · owned by Buckeye Power Inc

2023 · headline year
Reported fuel cost$6.9M2023 · reported deliveries
Capacity in service597MW3 units · gas
Net generation185GWh2023 · reported
CO₂ emitted112,266t2023 · reported to EPA · 2,235th highest of 6,030 in the US
Rank in Ohio#21of 189 · by capacity · #587 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor4%2023

Location

Van Wert County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 2.13 TBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 597 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1198.9Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 2198.9Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit 3198.9Natural GasNatural Gas Fired Combustion Turbine2002Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
AnrNatural gas2.24n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 193 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Buckeye Power Inc · 100%
Operating utility
Buckeye Power, Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001171
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
Gas pipeline
Anr Pipeline Company
EIA plant ID
7872

Common questions

How big is Robert P Mone?
597 MW across 3 generating units in service.
Who owns and operates it?
Owned by Buckeye Power Inc (100%) and operated by Buckeye Power, Inc, filed as cooperative.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. Every operating unit came online in 2002.
When is it due to retire?
No retirement date has been filed for any operating unit at Robert P Mone. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $6.9M in 2023.
How much CO₂ does it emit?
112,266 t in 2023, reported to the EPA — the 2,235th highest of 6,030 US facilities that reported. Up from 30,143 t in 2011.

Related pages

Ohio energyAll facilities in the state→Frank M Tait Station681 MW operating capacity→ Dresden Energy Facility678 MW operating capacity→ Fox Squirrel Solar577 MW operating capacity→ Woodsdale572 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming