AMERICAN ENERGY ATLAS
Power·Texas

Roadrunner, LLC Hybrid

Upton County, Texas · ERCOT · operated by Roadrunner Solar, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service463MW3 units · solar + storage
Rank in Texas#109of 941 · by capacity · #754 of 13,147 US

Location

Upton County · ERCOT · TRE

Generating units

3 of 3 shown · 463 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit RODR1200.0SolarSolar Photovoltaic2020Operating
Unit RODR2200.0SolarSolar Photovoltaic2020Operating
Unit BA63.3StorageBatteries2023Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Roadrunner Solar, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
62561

Common questions

How big is Roadrunner, LLC Hybrid?
463 MW across 3 generating units in service — 400 MW of solar and 63.3 MW of storage.
Who owns and operates it?
Operated by Roadrunner Solar, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. The oldest operating units are Unit RODR1 and Unit RODR2 (2020); the newest is Unit BA (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Roadrunner, LLC Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (400 MW) and Batteries (63.3 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Texas energyAll facilities in the state→Gregory Power Facility470 MW operating capacity→ Eastman Chemical - Texas Operations468 MW operating capacity→ 2W Permian Solar Project Hybrid460 MW operating capacity→ Texas City Cogeneration450 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming