AMERICAN ENERGY ATLAS
Power·Washington

River Road

Vancouver, Clark County, Washington · BPAT · operated by PUD No 1 of Clark County - (WA) · owned by Clark Public Utilities

2023 · headline year
Reported fuel cost$52.9M2023 · reported deliveries
Capacity in service248MW1 unit · gas
Net generation1.83TWh2023 · reported
CO₂ emitted700,250t2023 · reported to EPA · 782nd highest of 6,030 in the US
Rank in Washington#27of 128 · by capacity · #1,219 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor84%2023

Location

Clark County · BPAT · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 13.4 TBtu · reported

CO₂ emitted, t · 2011–2023

0250,000500,000750,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 248 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1248.0Natural GasNatural Gas Fired Combined Cycle1997Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 129 deliveries are on record for 2011–2023.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Clark Public Utilities · 100%
Operating utility
PUD No 1 of Clark County - (WA)
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001133
Balancing authority
BPAT
NERC region
WECC
Gas pipeline
Northwest Pipeline GP
EIA plant ID
7605

Common questions

How big is River Road?
248 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Clark Public Utilities (100%) and operated by PUD No 1 of Clark County - (WA), filed as political subdivision.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1997.
When is it due to retire?
No retirement date has been filed for any operating unit at River Road. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $52.9M in 2023.
How much CO₂ does it emit?
700,250 t in 2023, reported to the EPA — the 782nd highest of 6,030 US facilities that reported. Up from 394,116 t in 2011.

Related pages

Washington energyAll facilities in the state→Tucannon River Wind Farm267 MW operating capacity→ Windy Flats Wind Project262 MW operating capacity→ Swift 1240 MW operating capacity→ Marengo Wind Plant234 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming