AMERICAN ENERGY ATLAS
Power·Texas

Rio Grande Valley Sugar Growers

Hidalgo County, Texas · ERCOT · operated by Rio Grande Valley Sugar Growers, Inc.

Retired 20242023 · headline year

Retired — its last generating unit went out of service in 2024, ending 24.9 MW of capacity, 92% biomass by fuel energy in 2023.

Fuel spend$260,4682023 · estimate
Retired capacity24.9MW5 units · none in service
Reported suppliersNot reported2023

Location

Hidalgo County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

92% Biomass · 865,319 MMBtu · reported8% Natural gas · 76,864 MMBtu · reported · $186,011 est.

Biomass supplies 92% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

5 of 5 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEND16.0Agricultural byproductsOther Waste Biomass2009Retired 2024
Unit GENA2.5Agricultural byproductsOther Waste Biomass1973Retired 2024
Unit GENB2.5Agricultural byproductsOther Waste Biomass1973Retired 2024
Unit GENC2.5Agricultural byproductsOther Waste Biomass1995Retired 2024
Unit GENE1.4Distillate oilPetroleum Liquids2011Retired 2024

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Rio Grande Valley Sugar Growers, Inc.
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
54338

Common questions

How big is Rio Grande Valley Sugar Growers?
24.9 MW across 5 units, none of which is in service — all retired.
Who owns and operates it?
Operated by Rio Grande Valley Sugar Growers, Inc., filed as industrial.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
When is it due to retire?
It has already retired — the last unit retired in 2024.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass and natural gas.
How much does it spend on fuel?
An estimated $260,468 in 2023 — natural gas $186,011 and oil & petroleum $74,458. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Texas energyAll facilities in the state→Ridge TreaterIndustrial facility→ Rio Grande City BESS 2Power facility→ Rio Lago SolarPower facility→ Rio PecosPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming