AMERICAN ENERGY ATLAS
Power·Rhode Island

Ridgewood Providence Power

Providence County, Rhode Island · ISO-NE · operated by Rhode Island LFG Genco

2023 · headline year
Capacity in service6.4MW4 units · biomass
Net generation10.2GWh2023 · reported
Rank in Rhode Island#30of 105 · by capacity · #6,264 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor18%2023

Location

Providence County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 97,423 MMBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

15 of 15 shown · 6.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit PH211.6Landfill gasLandfill Gas2005Operating
Unit PH221.6Landfill gasLandfill Gas2005Operating
Unit PH231.6Landfill gasLandfill Gas2005Operating
Unit PH241.6Landfill gasLandfill Gas2005Operating
Unit GEN11.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN21.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN31.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN41.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN51.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN61.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN71.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN81.9Landfill gasLandfill Gas1990Retired 2013
Unit GEN91.9Landfill gasLandfill Gas1997Retired 2013
Unit PHI11.3Landfill gasLandfill Gas2004Retired 2013
Unit PHI21.3Landfill gasLandfill Gas2004Retired 2013

All 15 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Rhode Island LFG Genco
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
50365

Common questions

How big is Ridgewood Providence Power?
6.4 MW across 4 generating units in service. A further 11 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Rhode Island LFG Genco, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. Every operating unit came online in 2005.
When is it due to retire?
No retirement date has been filed for any operating unit at Ridgewood Providence Power. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

Rhode Island energyAll facilities in the state→Hopkins Hill CSG6.6 MW operating capacity→ White Rock Road LLC6.5 MW operating capacity→ 10 Briggs Solar NG, LLC (East)5.0 MW operating capacity→ Bristol Landfill Solar5.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming