AMERICAN ENERGY ATLAS
Power·California

Regional Wastewater Control Facility

San Joaquin County, California · CAISO · operated by City of Stockton MUD

2023 · headline year
Fuel spend$42,8552023 · estimate
Capacity in service1.0MW1 unit · biomass · 3 more on standby or out of service
Net generation4.09GWh2023 · reported
Rank in California#1,559 (tied)of 1,713 · by capacity · #12,215 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

San Joaquin County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

98% Landfill gas · 133,102 MMBtu · reported2% Natural gas · 3,041 MMBtu · reported · $41,388 est.

Landfill gas supplies 98% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 1.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 05011.8Distillate oilPetroleum Liquids2000Standby
Unit 01011.0BiogasOther Waste Biomass2000Out of service
Unit 03011.0BiogasOther Waste Biomass2000Operating
Unit 04011.0BiogasOther Waste Biomass2000Out of service
Unit 06013.0Distillate oilPetroleum Liquids2025Proposed

All 5 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →
UnitEventWhenMW
Unit 0601new unit20253.0 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Stockton MUD
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
56134

Common questions

How big is Regional Wastewater Control Facility?
1.0 MW across 1 generating unit in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Stockton MUD, filed as municipally owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2000.
When is it due to retire?
No retirement date has been filed for any operating unit at Regional Wastewater Control Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.
How much does it spend on fuel?
An estimated $42,855 in 2023 — natural gas $41,388 and oil & petroleum $1,467. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Ratkovich Alhambra1.0 MW operating capacity→ Re-Vfo LLC1.0 MW operating capacity→ Sacramento Fairbain Water Treatment Plan1.0 MW operating capacity→ Sacramento Soleil LLC1.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming