AMERICAN ENERGY ATLAS
Industrial + power·Maine

Regional Waste Systems Incorporated

Portland, Cumberland County, Maine · ISO-NE · operated by Ecomaine · owned by Ecomaine

2023 · headline year
Capacity in service13.3MW1 unit · waste
Net generation81.1GWh2023 · reported
CO₂ emitted62,778t2023 · reported to EPA · 3,246th highest of 6,030 in the US
Rank in Maine#51of 245 · by capacity · #5,063 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor70%2023

Location

Cumberland County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

99% Other fuels · 1.74 TBtu · reported1% Natural gas · 0.0169 TBtu · reported

Other fuels supplies 99% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 13.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TG113.3Municipal solid wasteMunicipal Solid Waste1988Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Ecomaine · 100%
Operating utility
Ecomaine
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1005673
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
50225

Common questions

How big is Regional Waste Systems Incorporated?
13.3 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Ecomaine (100%) and operated by Ecomaine, filed as municipally owned utility.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1988.
When is it due to retire?
No retirement date has been filed for any operating unit at Regional Waste Systems Incorporated. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels and natural gas.
How much CO₂ does it emit?
62,778 t in 2023, reported to the EPA — the 3,246th highest of 6,030 US facilities that reported. Up from 58,921 t in 2011.

Related pages

Maine energyAll facilities in the state→Bonny Eagle15.2 MW operating capacity→ Pejepscot Hydroelectric Project13.5 MW operating capacity→ West Enfield Hydro13.0 MW operating capacity→ Williams Hydro13.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming