AMERICAN ENERGY ATLAS
Power·Maine

ReEnergy Livermore Falls

Androscoggin County, Maine · ISO-NE · operated by ReEnergy Livermore Falls

2023 · headline year
Capacity in service39.6MW1 unit · biomass
Net generation223GWh2023 · reported
Rank in Maine#27of 245 · by capacity · #3,793 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor64%2023

Location

Androscoggin County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 2.9 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 39.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN139.6WoodWood/Wood Waste Biomass1992Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
ReEnergy Livermore Falls
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
10354

Common questions

How big is ReEnergy Livermore Falls?
39.6 MW across 1 generating unit in service.
Who owns and operates it?
Operated by ReEnergy Livermore Falls, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1992.
When is it due to retire?
No retirement date has been filed for any operating unit at ReEnergy Livermore Falls. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

Maine energyAll facilities in the state→Passadumkeag Windpark LLC42.9 MW operating capacity→ Mars Hill Wind Farm Project42.0 MW operating capacity→ Cape Gas Turbine35.0 MW operating capacity→ Bull Hill Wind Project34.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming