AMERICAN ENERGY ATLAS
Power·New York

ReEnergy Black River LLC

Fort Drum, Jefferson County, New York · NYISO · operated by Black River Generation LLC · owned by Reenergy Black River LLC

Generating units retired 20232023 · headline year

Retired — its last generating unit went out of service in 2023, ending 55.5 MW of capacity, 100% biomass by fuel energy in 2023.

Retired capacity55.5MW1 unit · none in service
CO₂ emitted13,625t2023 · reported to EPA · 5,647th highest of 6,030 in the US
Rank in New York#174of 197 · by reported CO₂ · #5,647 of 6,030 US
Reported suppliersNot reported2023 · last deliveries 2022

Location

Jefferson County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 1.43 TBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN155.5WoodWood/Wood Waste Biomass1989Retired 2023

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 77 deliveries are on record for 2012–2022.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Reenergy Black River LLC · 100%
Operating utility
Black River Generation LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1000482
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
10464

Common questions

How big is ReEnergy Black River LLC?
55.5 MW across 1 unit, none of which is in service — all retired.
Who owns and operates it?
Owned by Reenergy Black River LLC (100%) and operated by Black River Generation LLC, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
When is it due to retire?
It has already retired — the last unit retired in 2023.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.
How much CO₂ does it emit?
13,625 t in 2023, reported to the EPA — the 5,647th highest of 6,030 US facilities that reported. Up from 98 t in 2011.

Related pages

New York energyAll facilities in the state→Suny at Binghamton16,071 t CO₂ in 2023→ New Bath Landfill15,691 t CO₂ in 2023→ Nfgsc Independence Station13,334 t CO₂ in 2023→ Cascades Containerboard Packaging- Niagara Falls13,029 t CO₂ in 2023→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming