Redding Power Plant

Redding, Shasta County, California · BANC · operated by City of Redding - (CA) · owned by City of Redding California

2023 · headline year
Fuel spend$26.1M2023 · estimate
Capacity in service183MW6 units · gas
Net generation364GWh2023 · reported
CO₂ emitted169,404t2023 · reported to EPA · 1,696th highest of 6,030 in the US
Rank in California#128of 1,713 · by capacity · #1,601 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor23%2023

Location

Shasta County · BANC · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 3.13 TBtu · reported · $26.1M est.

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 183 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 642.5Natural GasNatural Gas Fired Combined Cycle2011Operating
Unit 540.0Natural GasNatural Gas Fired Combined Cycle2002Operating
Unit 227.9Natural GasNatural Gas Fired Combustion Turbine1996Operating
Unit 327.9Natural GasNatural Gas Fired Combustion Turbine1996Operating
Unit 426.8Natural GasNatural Gas Fired Combined Cycle1989Operating
Unit 118.0Natural GasNatural Gas Fired Combustion Turbine1996Operating

All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 12 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Redding California · 100%
Operating utility
City of Redding - (CA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000161
Balancing authority
BANC
NERC region
WECC
EIA plant ID
7307

Common questions

How big is Redding Power Plant?
183 MW across 6 generating units in service.
Who owns and operates it?
Owned by City of Redding California (100%) and operated by City of Redding - (CA), filed as municipally owned utility.
Which grid does it sell into?
BANC (Balancing Authority of Northern California) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2000. The oldest operating unit is Unit 4 (1989); the newest is Unit 6 (2011).
When is it due to retire?
No retirement date has been filed for any operating unit at Redding Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $26.1M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
169,404 t in 2023, reported to the EPA — the 1,696th highest of 6,030 US facilities that reported. Up from 26,593 t in 2011.

Related pages

California energyAll facilities in the state→Manzana Wind LLC189 MW operating capacity→ Blythe Solar IV, LLC184 MW operating capacity→ Elkhorn Battery Energy Storage System182 MW operating capacity→ Dion R Holm180 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming