Fuel spend$02023 · no purchased fuel
Capacity in service5.6MW2 units · wind + solar
Rank in Minnesota#171 (tied)of 767 · by capacity · #6,449 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: turbine manufacturer, turbine count and hub height; panel technology, tracking and DC capacity.
See the engineering record →
How big is Red Lake Falls Community Hybrid?
5.6 MW across 2 generating units in service — 4.6 MW of wind and 1.0 MW of solar.
Who owns and operates it?
Operated by Consolidated Edison Development Inc., filed as independent power producer.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. Every operating unit came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Red Lake Falls Community Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Onshore Wind Turbine (4.6 MW) and Solar Photovoltaic (1.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (onshore wind turbine and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.