Fuel spend$02023 · no purchased fuel
Capacity in service81.0MW2 units · solar + wind
Rank in Arizona#65of 166 · by capacity · #2,700 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: turbine manufacturer, turbine count and hub height; panel technology, tracking and DC capacity.
See the engineering record →
How big is Red Horse 2?
81.0 MW across 2 generating units in service — 51.0 MW of solar and 30.0 MW of wind.
Who owns and operates it?
Operated by Red Horse 2, filed as independent power producer.
Which grid does it sell into?
TEPC (Tucson Electric Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2015. Every operating unit came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Red Horse 2. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (51.0 MW) and Onshore Wind Turbine (30.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (onshore wind turbine and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.