AMERICAN ENERGY ATLAS
Industrial + power·Florida

RAYONIER PERFORMANCE FIBERS LLC Fernandina Mill

Fernandina Beach, Nassau County, Florida · JEA · operated by Rayonier Advanced Materials · owned by Rayonier Advanced Materials Inc

2023 · headline year
Fuel spend$11.2M2023 · estimate
Capacity in service42.0MW2 units · biomass
Net generation133GWh2023 · reported
CO₂ emitted90,445t2023 · reported to EPA · 2,571st highest of 6,030 in the US
Rank in Florida#224 (tied)of 310 · by capacity · #3,709 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor36%2023

Location

Nassau County · JEA · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

67% Biomass · 2.8 TBtu · reported32% Natural gas · 1.34 TBtu · reported · $10.9M est.

Biomass supplies 67% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 42.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN522.0WoodWood/Wood Waste Biomass2012Operating
Unit GEN420.0WoodWood/Wood Waste Biomass1950Operating
Unit GEN37.5WoodWood/Wood Waste Biomass1939Retired 2012
Unit GEN25.0Residual oilPetroleum Liquids1939Retired 2005

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Rayonier Advanced Materials Inc · 100%
Operating utility
Rayonier Advanced Materials
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper
EPA facility ID
1001906
Balancing authority
JEA
NERC region
SERC
EIA plant ID
10562

Common questions

How big is RAYONIER PERFORMANCE FIBERS LLC Fernandina Mill?
42.0 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Rayonier Advanced Materials Inc (100%) and operated by Rayonier Advanced Materials, filed as industrial.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1982. The oldest operating unit is Unit GEN4 (1950); the newest is Unit GEN5 (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at RAYONIER PERFORMANCE FIBERS LLC Fernandina Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned biomass and natural gas.
How much does it spend on fuel?
An estimated $11.2M in 2023 — natural gas $10.9M and oil & petroleum $284,087. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
90,445 t in 2023, reported to the EPA — the 2,571st highest of 6,030 US facilities that reported. Up from 46,584 t in 2011.

Related pages

Florida energyAll facilities in the state→Big Bend II Solar45.8 MW operating capacity→ J Woodruff43.5 MW operating capacity→ FL Solar 4, LLC42.0 MW operating capacity→ Dover Solar and Battery Storage40.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming