Power·California
Rancho Penasquitos
San Diego County, California · CAISO · operated by San Diego County Water Auth
Capacity shown is planned or not in service
Proposed
A planned 4.3 MW conventional hydroelectric project, filed to come online in 2025.
Planned capacity4.3MW1 unit · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- San Diego County Water Auth
- Entity type
- State-Owned Utility
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 56615
Common questions
How big is Rancho Penasquitos?
4.3 MW across 1 unit, none of which is in service — the rest planned.
Who owns and operates it?
Operated by San Diego County Water Auth, filed as state-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Conventional Hydroelectric (4.3 MW).
Related pages
Select a state