Capacity in service176MW2 units · gas · incl. 88.4 MW online after 2023 · 1 more on standby or out of service
Net generation27.5GWh2023 · reported
CO₂ emitted21,517t2023 · reported to EPA · 5,368th highest of 6,030 in the US
Rank in North Dakota#16of 55 · by capacity · #1,638 (tied) of 13,147 US
Reported suppliers22023 · 11 deliveries
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 371,627 MMBtu · reported
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 176 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 4
88.4
Natural Gas
Natural Gas Fired Combustion Turbine
2024
Operating
Unit 3
88.0
Natural Gas
Natural Gas Fired Combustion Turbine
2014
Operating
Unit EMER
2.0
Natural Gas
Natural Gas Internal Combustion Engine
2024
Standby
Unit 2
75.0
Lignite
Conventional Steam Coal
1963
Retired 2022
Unit 1
40.0
Lignite
Conventional Steam Coal
1954
Retired 2022
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 387 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
176 MW across 2 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Mdu Resources Group Inc (100%) and operated by Montana-Dakota Utilities Co, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2019. The oldest operating unit is Unit 3 (2014); the newest is Unit 4 (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at R M Heskett. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $2.68M in 2023.
How much CO₂ does it emit?
21,517 t in 2023, reported to the EPA — the 5,368th highest of 6,030 US facilities that reported. Down from 638,412 t in 2011.