East Palatka, Putnam County, Florida · FPL · operated by Florida Power & Light Co
last reported to the EPA in 2014
Retired — its last generating unit went out of service in 2014, ending 580 MW of capacity.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1ST | 120.0 | Natural Gas | Natural Gas Fired Combined Cycle | 1978 | Retired 2014 |
| Unit 2ST | 120.0 | Natural Gas | Natural Gas Fired Combined Cycle | 1977 | Retired 2014 |
| Unit 1GT1 | 85.0 | Natural Gas | Natural Gas Fired Combined Cycle | 1978 | Retired 2014 |
| Unit 1GT2 | 85.0 | Natural Gas | Natural Gas Fired Combined Cycle | 1978 | Retired 2014 |
| Unit 2GT1 | 85.0 | Natural Gas | Natural Gas Fired Combined Cycle | 1977 | Retired 2014 |
| Unit 2GT2 | 85.0 | Natural Gas | Natural Gas Fired Combined Cycle | 1977 | Retired 2014 |
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.