Power·Texas
PRSI FCC Generator
Harris County, Texas · ERCOT · operated by Pasadena Refining System Inc
Capacity shown is planned or not in service
Out of service
Out-of-service capacity4.7MW1 unit · none in service
Reported suppliersNot reported2023
Location
Reported fuel consumption, TBtu · 2012–21
Reported (through 2021)
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Who supplies the fuel
2023
No fuel deliveries are reported for 2023.
Ownership & operations
- Operating utility
- Pasadena Refining System Inc
- Entity type
- Industrial
- Regulatory status
- Not Regulated
- Balancing authority
- ERCOT
- NERC region
- Texas RE (TRE)
- EIA plant ID
- 58069
Common questions
How big is PRSI FCC Generator?
4.7 MW across 1 unit, none of which is in service — all on standby or out of service.
Who owns and operates it?
Operated by Pasadena Refining System Inc, filed as industrial.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by petroleum coke.
Related pages
Select a state