Carson County, Texas
Capacity shown is planned or not in service
A planned 11,679 MW natural gas fired combined cycle project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit F1G01 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F1G02 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F1G03 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F2G01 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F2G02 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F2G03 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit ES001 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES002 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES003 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES004 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES005 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES006 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES007 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES008 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES009 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES010 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES011 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES012 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES013 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES014 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES015 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit ES016 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit F1S01 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F1S02 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F1S03 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F2S01 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F2S02 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit F2S03 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit FBS01 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2027 | Planned |
| Unit MS001 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS002 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS003 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS004 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS005 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS006 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS007 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS008 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS009 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS010 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS011 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS012 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS013 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS014 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS015 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MS016 | 105.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG001 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG002 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG003 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG004 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG005 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG006 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG007 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG008 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG009 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG010 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG011 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG012 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG013 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG014 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG015 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG016 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG017 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG018 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG019 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG020 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG021 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG022 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG023 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG024 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG025 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG026 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG027 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG028 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG029 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG030 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG031 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG032 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG033 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG034 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG035 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG036 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG037 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG038 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG039 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG040 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG041 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG042 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG043 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG044 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG045 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG046 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG047 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit EG048 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG001 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG002 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG003 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG004 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG005 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG006 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG007 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG008 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG009 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG010 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG011 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG012 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG013 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG014 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG015 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG016 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG017 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG018 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG019 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG020 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG021 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG022 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG023 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG024 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG025 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG026 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG027 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG028 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG029 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG030 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG031 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG032 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG033 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG034 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG035 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG036 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG037 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG038 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG039 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG040 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG041 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG042 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG043 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG044 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG045 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG046 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG047 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit MG048 | 57.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2030 | Planned |
| Unit FBG01 | 50.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Planned |
| Unit FBG02 | 50.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Planned |
| Unit FBG03 | 50.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Planned |
| Unit FBG04 | 50.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Planned |
| Unit FBG05 | 50.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Planned |
| Unit FBG06 | 50.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2026 | Planned |
| Unit G6B01 | 40.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Planned |
| Unit G6B02 | 40.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Planned |
| Unit G6B03 | 40.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Planned |
| Unit TM001 | 18.9 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Planned |
| Unit TM002 | 18.9 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Planned |
| Unit TM003 | 18.9 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Planned |
| Unit TM004 | 18.9 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Planned |
| Unit TM005 | 18.9 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Planned |
| Unit TM006 | 18.9 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Planned |
| Unit TM007 | 18.9 | Natural Gas | Natural Gas Fired Combustion Turbine | 2027 | Planned |
All 157 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit FBG01 | new unit | 2026 | 50.0 MW |
| Unit FBG02 | new unit | 2026 | 50.0 MW |
| Unit FBG03 | new unit | 2026 | 50.0 MW |
| Unit FBG04 | new unit | 2026 | 50.0 MW |
| Unit FBG05 | new unit | 2026 | 50.0 MW |
| Unit FBG06 | new unit | 2026 | 50.0 MW |
| Unit G6B01 | new unit | 2026 | 40.0 MW |
| Unit G6B02 | new unit | 2026 | 40.0 MW |
| Unit G6B03 | new unit | 2026 | 40.0 MW |
| Unit F1G01 | new unit | 2027 | 260 MW |
| Unit F1G02 | new unit | 2027 | 260 MW |
| Unit F1G03 | new unit | 2027 | 260 MW |
| Unit F1S01 | new unit | 2027 | 105 MW |
| Unit F1S02 | new unit | 2027 | 105 MW |
| Unit F1S03 | new unit | 2027 | 105 MW |
| Unit F2G01 | new unit | 2027 | 260 MW |
| Unit F2G02 | new unit | 2027 | 260 MW |
| Unit F2G03 | new unit | 2027 | 260 MW |
| Unit F2S01 | new unit | 2027 | 105 MW |
| Unit F2S02 | new unit | 2027 | 105 MW |
| Unit F2S03 | new unit | 2027 | 105 MW |
| Unit FBS01 | new unit | 2027 | 105 MW |
| Unit TM001 | new unit | 2027 | 18.9 MW |
| Unit TM002 | new unit | 2027 | 18.9 MW |
| Unit TM003 | new unit | 2027 | 18.9 MW |
| Unit TM004 | new unit | 2027 | 18.9 MW |
| Unit TM005 | new unit | 2027 | 18.9 MW |
| Unit TM006 | new unit | 2027 | 18.9 MW |
| Unit TM007 | new unit | 2027 | 18.9 MW |
| Unit EG001 | new unit | 2030 | 57.0 MW |
| Unit EG002 | new unit | 2030 | 57.0 MW |
| Unit EG003 | new unit | 2030 | 57.0 MW |
| Unit EG004 | new unit | 2030 | 57.0 MW |
| Unit EG005 | new unit | 2030 | 57.0 MW |
| Unit EG006 | new unit | 2030 | 57.0 MW |
| Unit EG007 | new unit | 2030 | 57.0 MW |
| Unit EG008 | new unit | 2030 | 57.0 MW |
| Unit EG009 | new unit | 2030 | 57.0 MW |
| Unit EG010 | new unit | 2030 | 57.0 MW |
| Unit EG011 | new unit | 2030 | 57.0 MW |
| Unit EG012 | new unit | 2030 | 57.0 MW |
| Unit EG013 | new unit | 2030 | 57.0 MW |
| Unit EG014 | new unit | 2030 | 57.0 MW |
| Unit EG015 | new unit | 2030 | 57.0 MW |
| Unit EG016 | new unit | 2030 | 57.0 MW |
| Unit EG017 | new unit | 2030 | 57.0 MW |
| Unit EG018 | new unit | 2030 | 57.0 MW |
| Unit EG019 | new unit | 2030 | 57.0 MW |
| Unit EG020 | new unit | 2030 | 57.0 MW |
| Unit EG021 | new unit | 2030 | 57.0 MW |
| Unit EG022 | new unit | 2030 | 57.0 MW |
| Unit EG023 | new unit | 2030 | 57.0 MW |
| Unit EG024 | new unit | 2030 | 57.0 MW |
| Unit EG025 | new unit | 2030 | 57.0 MW |
| Unit EG026 | new unit | 2030 | 57.0 MW |
| Unit EG027 | new unit | 2030 | 57.0 MW |
| Unit EG028 | new unit | 2030 | 57.0 MW |
| Unit EG029 | new unit | 2030 | 57.0 MW |
| Unit EG030 | new unit | 2030 | 57.0 MW |
| Unit EG031 | new unit | 2030 | 57.0 MW |
| Unit EG032 | new unit | 2030 | 57.0 MW |
| Unit EG033 | new unit | 2030 | 57.0 MW |
| Unit EG034 | new unit | 2030 | 57.0 MW |
| Unit EG035 | new unit | 2030 | 57.0 MW |
| Unit EG036 | new unit | 2030 | 57.0 MW |
| Unit EG037 | new unit | 2030 | 57.0 MW |
| Unit EG038 | new unit | 2030 | 57.0 MW |
| Unit EG039 | new unit | 2030 | 57.0 MW |
| Unit EG040 | new unit | 2030 | 57.0 MW |
| Unit EG041 | new unit | 2030 | 57.0 MW |
| Unit EG042 | new unit | 2030 | 57.0 MW |
| Unit EG043 | new unit | 2030 | 57.0 MW |
| Unit EG044 | new unit | 2030 | 57.0 MW |
| Unit EG045 | new unit | 2030 | 57.0 MW |
| Unit EG046 | new unit | 2030 | 57.0 MW |
| Unit EG047 | new unit | 2030 | 57.0 MW |
| Unit EG048 | new unit | 2030 | 57.0 MW |
| Unit ES001 | new unit | 2030 | 105 MW |
| Unit ES002 | new unit | 2030 | 105 MW |
| Unit ES003 | new unit | 2030 | 105 MW |
| Unit ES004 | new unit | 2030 | 105 MW |
| Unit ES005 | new unit | 2030 | 105 MW |
| Unit ES006 | new unit | 2030 | 105 MW |
| Unit ES007 | new unit | 2030 | 105 MW |
| Unit ES008 | new unit | 2030 | 105 MW |
| Unit ES009 | new unit | 2030 | 105 MW |
| Unit ES010 | new unit | 2030 | 105 MW |
| Unit ES011 | new unit | 2030 | 105 MW |
| Unit ES012 | new unit | 2030 | 105 MW |
| Unit ES013 | new unit | 2030 | 105 MW |
| Unit ES014 | new unit | 2030 | 105 MW |
| Unit ES015 | new unit | 2030 | 105 MW |
| Unit ES016 | new unit | 2030 | 105 MW |
| Unit MG001 | new unit | 2030 | 57.0 MW |
| Unit MG002 | new unit | 2030 | 57.0 MW |
| Unit MG003 | new unit | 2030 | 57.0 MW |
| Unit MG004 | new unit | 2030 | 57.0 MW |
| Unit MG005 | new unit | 2030 | 57.0 MW |
| Unit MG006 | new unit | 2030 | 57.0 MW |
| Unit MG007 | new unit | 2030 | 57.0 MW |
| Unit MG008 | new unit | 2030 | 57.0 MW |
| Unit MG009 | new unit | 2030 | 57.0 MW |
| Unit MG010 | new unit | 2030 | 57.0 MW |
| Unit MG011 | new unit | 2030 | 57.0 MW |
| Unit MG012 | new unit | 2030 | 57.0 MW |
| Unit MG013 | new unit | 2030 | 57.0 MW |
| Unit MG014 | new unit | 2030 | 57.0 MW |
| Unit MG015 | new unit | 2030 | 57.0 MW |
| Unit MG016 | new unit | 2030 | 57.0 MW |
| Unit MG017 | new unit | 2030 | 57.0 MW |
| Unit MG018 | new unit | 2030 | 57.0 MW |
| Unit MG019 | new unit | 2030 | 57.0 MW |
| Unit MG020 | new unit | 2030 | 57.0 MW |
| Unit MG021 | new unit | 2030 | 57.0 MW |
| Unit MG022 | new unit | 2030 | 57.0 MW |
| Unit MG023 | new unit | 2030 | 57.0 MW |
| Unit MG024 | new unit | 2030 | 57.0 MW |
| Unit MG025 | new unit | 2030 | 57.0 MW |
| Unit MG026 | new unit | 2030 | 57.0 MW |
| Unit MG027 | new unit | 2030 | 57.0 MW |
| Unit MG028 | new unit | 2030 | 57.0 MW |
| Unit MG029 | new unit | 2030 | 57.0 MW |
| Unit MG030 | new unit | 2030 | 57.0 MW |
| Unit MG031 | new unit | 2030 | 57.0 MW |
| Unit MG032 | new unit | 2030 | 57.0 MW |
| Unit MG033 | new unit | 2030 | 57.0 MW |
| Unit MG034 | new unit | 2030 | 57.0 MW |
| Unit MG035 | new unit | 2030 | 57.0 MW |
| Unit MG036 | new unit | 2030 | 57.0 MW |
| Unit MG037 | new unit | 2030 | 57.0 MW |
| Unit MG038 | new unit | 2030 | 57.0 MW |
| Unit MG039 | new unit | 2030 | 57.0 MW |
| Unit MG040 | new unit | 2030 | 57.0 MW |
| Unit MG041 | new unit | 2030 | 57.0 MW |
| Unit MG042 | new unit | 2030 | 57.0 MW |
| Unit MG043 | new unit | 2030 | 57.0 MW |
| Unit MG044 | new unit | 2030 | 57.0 MW |
| Unit MG045 | new unit | 2030 | 57.0 MW |
| Unit MG046 | new unit | 2030 | 57.0 MW |
| Unit MG047 | new unit | 2030 | 57.0 MW |
| Unit MG048 | new unit | 2030 | 57.0 MW |
| Unit MS001 | new unit | 2030 | 105 MW |
| Unit MS002 | new unit | 2030 | 105 MW |
| Unit MS003 | new unit | 2030 | 105 MW |
| Unit MS004 | new unit | 2030 | 105 MW |
| Unit MS005 | new unit | 2030 | 105 MW |
| Unit MS006 | new unit | 2030 | 105 MW |
| Unit MS007 | new unit | 2030 | 105 MW |
| Unit MS008 | new unit | 2030 | 105 MW |
| Unit MS009 | new unit | 2030 | 105 MW |
| Unit MS010 | new unit | 2030 | 105 MW |
| Unit MS011 | new unit | 2030 | 105 MW |
| Unit MS012 | new unit | 2030 | 105 MW |
| Unit MS013 | new unit | 2030 | 105 MW |
| Unit MS014 | new unit | 2030 | 105 MW |
| Unit MS015 | new unit | 2030 | 105 MW |
| Unit MS016 | new unit | 2030 | 105 MW |