Fuel spend$86,7482023 · estimate
Capacity in service12.3MW5 units · oil
Net generation179MWh2023 · reported
Rank in Minnesota#117of 767 · by capacity · #5,131 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Mille Lacs County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 4,057 MMBtu · reported · $86,748 est.

Reported fuel consumption, MMBtu · 2011–2023

05,00010,00015,000201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 12.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 75.0Distillate oilPetroleum Liquids2003Operating
Unit 62.7Distillate oilPetroleum Liquids1963Operating
Unit 32.4Distillate oilPetroleum Liquids1978Operating
Unit 41.2Distillate oilPetroleum Liquids1967Operating
Unit 51.0Distillate oilPetroleum Liquids1953Operating
Unit 10.1Distillate oilPetroleum Liquids1938Retired 2002
Unit 20.1Distillate oilPetroleum Liquids1938Retired 2002

All 7 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Princeton Public Utils Comm
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
EIA plant ID
2005

Common questions

How big is Princeton (MN)?
12.3 MW across 5 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Princeton Public Utils Comm, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1982. The oldest operating unit is Unit 5 (1953); the newest is Unit 7 (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at Princeton (MN). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $86,748 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Minnesota energyAll facilities in the state→Southeast Steam Plant13.0 MW operating capacity→ Detroit Lakes12.5 MW operating capacity→ Fond Du Lac12.0 MW operating capacity→ ST James Diesel Generating Plant12.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming