AMERICAN ENERGY ATLAS
Power·Iowa

Preston (IA)

Jackson County, Iowa · MISO · operated by City of Preston

2023 · headline year
Fuel spend$10,6232023 · estimate
Capacity in service3.6MW2 units · gas + oil
Net generation54MWh2023 · reported
Rank in Iowa#177 (tied)of 256 · by capacity · #8,368 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Jackson County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

59% Oil & petroleum · 454 MMBtu · reported · $9,708 est.41% Natural gas · 314 MMBtu · reported · $915 est.

Oil & petroleum supplies 59% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Preston (IA) an estimated 7.3× more than natural gas — and oil & petroleum is 1 of its 2 operating units and 50% of operating capacity.

Reported fuel consumption, MMBtu · 2011–2023

0300600900201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 3.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 41.8Natural GasNatural Gas Internal Combustion Engine1980Operating
Unit 51.8Distillate oilPetroleum Liquids2020Operating
Unit 10.7Distillate oilPetroleum Liquids1968Retired 2014
Unit 20.7Distillate oilPetroleum Liquids1968Retired 2014

All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Preston
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
Gas pipeline
Northern Natural Gas
EIA plant ID
1176

Common questions

How big is Preston (IA)?
3.6 MW across 2 generating units in service — 1.8 MW of natural gas and 1.8 MW of oil. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Preston, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2000. The oldest operating unit is Unit 4 (1980); the newest is Unit 5 (2020).
When is it due to retire?
No retirement date has been filed for any operating unit at Preston (IA). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum and natural gas.
How much does it spend on fuel?
An estimated $10,623 in 2023 — oil & petroleum $9,708 and natural gas $915. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Iowa energyAll facilities in the state→West Dubuque Solar3.8 MW operating capacity→ Bancroft3.6 MW operating capacity→ Poet Bioprocessing Emmetsburg3.5 MW operating capacity→ Graettinger3.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming