The largest reported CO₂ emitter among facilities in Illinois — 11.5 Mt in 2023, 100% coal by fuel energy in 2023, first unit online in 2012.
Fuel spend$248M2023 · estimate
Capacity in service1,766MW2 units · coal
Net generation12.5TWh2023 · reported
CO₂ emitted11.5Mt2023 · reported to EPA · 7th highest of 6,030 in the US
Rank in Illinois#7of 433 · by capacity · #106 of 13,147 US
Reported suppliers22023 · 24 deliveries
Capacity factor81%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 118 TBtu · reported · $248M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
2 of 2 shown · 1,766 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit PC1
883.0
Bituminous coal
Conventional Steam Coal
2012
Operating
Unit PC2
883.0
Bituminous coal
Conventional Steam Coal
2012
Operating
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 235 deliveries recorded 2012–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
American Mun Power-Ohio, Inc 23% of 2 units Illinois Municipal Elec Agency 15% of 2 units Indiana Municipal Power Agency 13% of 2 units Kentucky Municipal Power Agency 8% of 2 units Lively Grove Energy Partners LLC 5% of 1 unit Missouri Jnt Muni.Pwr Elec. Ut. Comm. 12% of 2 units + 4 more
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Other, Power Plants
EPA facility ID
1001887
Balancing authority
MISO
NERC region
SERC
Gas pipeline
Ameren Illinois
EIA plant ID
55856
Common questions
How big is Prairie State Generating Station?
1,766 MW across 2 generating units in service.
Who owns and operates it?
Owned by Prairie State Energy Campus Management Co and operated by Prairie State Generating Co LLC, filed as municipally owned utility. 10 owner stakes are filed on jointly held units.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2012. Every operating unit came online in 2012.
When is it due to retire?
No retirement date has been filed for any operating unit at Prairie State Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 1 coal supplier, from mines in Illinois — principally Lively Grove Mine. Other fuels (natural gas) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $248M in 2023 — coal $248M and natural gas $645,223. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
11.5 Mt in 2023, reported to the EPA — the 7th highest of 6,030 US facilities that reported. Up from 16,495 t in 2011.