Power Station 4

Galveston County, Texas · ERCOT · operated by South Houston Green Power LLC

2023 · headline year
Fuel spend$20.7M2023 · estimate
Capacity in service156MW2 units · gas · 1 more on standby or out of service
Rank in Texas#353of 941 · by capacity · #1,775 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011

Location

Galveston County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 7.65 TBtu · reported · $20.7M est.

Reported fuel consumption, TBtu · 2011–2023

051015201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 156 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN178.2Natural GasNatural Gas Fired Combined Cycle1986Operating
Unit GEN278.2Natural GasNatural Gas Fired Combined Cycle1986Operating
Unit GEN334.7Natural GasNatural Gas Fired Combined Cycle1986Out of service

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 12 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
South Houston Green Power LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Houston PL Co LP, Kinder Morgan Tejas Pipeline LLC
EIA plant ID
52132

Common questions

How big is Power Station 4?
156 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by South Houston Green Power LLC, filed as industrial.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1986. Every operating unit came online in 1986.
When is it due to retire?
No retirement date has been filed for any operating unit at Power Station 4. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $20.7M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Texas energyAll facilities in the state→Gopher Creek Wind Farm158 MW operating capacity→ BPL Files Solar158 MW operating capacity→ Fluvanna155 MW operating capacity→ Buckthorn Westex154 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming