AMERICAN ENERGY ATLAS
Power·Massachusetts

Potter

Braintree, Norfolk County, Massachusetts · ISO-NE · operated by Town of Braintree - (MA) · owned by Braintree Electric Light Department

2023 · headline year
Reported fuel cost$2.6M2023 · reported deliveries
Capacity in service116MW2 units · gas
Net generation32.3GWh2023 · reported
CO₂ emitted18,347t2023 · reported to EPA · 5,487th highest of 6,030 in the US
Rank in Massachusetts#20of 666 · by capacity · #2,175 (tied) of 13,147 US
Reported suppliers22023 · 24 deliveries

Location

Norfolk County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

88% Natural gas · 287,239 MMBtu · reported12% Oil & petroleum · 38,478 MMBtu · reported

Natural gas supplies 88% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 116 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit WAT158.0Natural GasNatural Gas Fired Combustion Turbine2009Operating
Unit WAT258.0Natural GasNatural Gas Fired Combustion Turbine2009Operating
Unit CC276.0Natural GasNatural Gas Fired Combined Cycle1977Retired 2024
Unit CC325.0Natural GasNatural Gas Fired Combined Cycle1977Retired 2024
Unit IC12.7Distillate oilPetroleum Liquids1963Retired 2014
Unit IC22.7Distillate oilPetroleum Liquids1963Retired 2007

All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
BPNatural gas287,241n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 273 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Town of Braintree - (MA)
Jointly held units
City of Hingham - (MA) 2% of 2 units
Town of Braintree - (MA) 92% of 2 units
Town of North Attleborough - (MA) 5% of 2 units
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000665
Balancing authority
ISO-NE
NERC region
NPCC
Gas pipeline
Algonquin Gas Transmission Company
EIA plant ID
1660

Common questions

How big is Potter?
116 MW across 2 generating units in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Braintree Electric Light Department (100%) and operated by Town of Braintree - (MA), filed as municipally owned utility. 3 owner stakes are filed on jointly held units.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. Every operating unit came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Potter. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $2.6M in 2023.
How much CO₂ does it emit?
18,347 t in 2023, reported to the EPA — the 5,487th highest of 6,030 US facilities that reported. Down from 31,559 t in 2011.

Related pages

Massachusetts energyAll facilities in the state→Pittsfield Generating176 MW operating capacity→ Cleary Flood121 MW operating capacity→ Semass Partnership Resource Recovery Facility98.5 MW operating capacity→ Dartmouth Power97.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming