AMERICAN ENERGY ATLAS
Industrial + power·Washington

Port Townsend Paper Corp

Port Townsend, Jefferson County, Washington · BPAT · operated by Port Townsend Paper Co · owned by Crown Paper Group Inc

2023 · headline year
Capacity in service7.9MW2 units · biomass + hydro
CO₂ emitted62,519t2023 · reported to EPA · 3,258th highest of 6,030 in the US
Rank in Washington#100of 128 · by capacity · #5,980 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Jefferson County · BPAT · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

95% Black liquor · 10.9 TBtu · reported4% Natural gas · 0.404 TBtu · reported1% Oil & petroleum · 0.147 TBtu · reported

Black liquor supplies 95% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 7.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN67.5Black liquorWood/Wood Waste Biomass1986Operating
Unit HDRO0.4WaterConventional Hydroelectric1982Operating
Unit GEN23.0Black liquorWood/Wood Waste Biomass1929Retired 2009
Unit GEN43.0Black liquorWood/Wood Waste Biomass1929Retired 2016

All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Crown Paper Group Inc · 100%
Operating utility
Port Townsend Paper Co
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper, Waste
EPA facility ID
1005732
Balancing authority
BPAT
NERC region
WECC
EIA plant ID
50544

Common questions

How big is Port Townsend Paper Corp?
7.9 MW across 2 generating units in service — 7.5 MW of biomass and 0.4 MW of hydro. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Crown Paper Group Inc (100%) and operated by Port Townsend Paper Co, filed as industrial.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1986. The oldest operating unit is Unit HDRO (1982); the newest is Unit GEN6 (1986).
When is it due to retire?
No retirement date has been filed for any operating unit at Port Townsend Paper Corp. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor, natural gas and oil & petroleum.
How much CO₂ does it emit?
62,519 t in 2023, reported to the EPA — the 3,258th highest of 6,030 US facilities that reported. Down from 110,580 t in 2011.

Related pages

Washington energyAll facilities in the state→Upper Falls10.0 MW operating capacity→ Quincy Chute9.4 MW operating capacity→ Youngs Creek Hydroelectric Project7.5 MW operating capacity→ PEC Headworks6.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming