Port Edwards Mill

Wood County, Wisconsin · MISO · operated by Domtar Industries Inc

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service6.7MW11 units · hydro
Rank in Wisconsin#115of 258 · by capacity · #6,206 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Wood County · MISO · RFC

Generating units

13 of 13 shown · 6.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit JHG11.3WaterConventional Hydroelectric1926Operating
Unit HG50.8WaterConventional Hydroelectric1926Operating
Unit HG60.8WaterConventional Hydroelectric1926Operating
Unit JHG20.6WaterConventional Hydroelectric1938Operating
Unit JHG30.6WaterConventional Hydroelectric1939Operating
Unit JHG50.6WaterConventional Hydroelectric1977Operating
Unit HG10.4WaterConventional Hydroelectric1913Operating
Unit HG20.4WaterConventional Hydroelectric1913Operating
Unit HG30.4WaterConventional Hydroelectric1913Operating
Unit HG40.4WaterConventional Hydroelectric1913Operating
Unit JHG40.4WaterConventional Hydroelectric1943Operating
Unit GEN75.0Residual oilPetroleum Liquids1962Retired 2013
Unit GEN41.9Residual oilPetroleum Liquids1930Retired 2013

All 13 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Domtar Industries Inc
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
54103

Common questions

How big is Port Edwards Mill?
6.7 MW across 11 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Domtar Industries Inc, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1931. The oldest operating units are Unit HG1, Unit HG2, Unit HG3 and Unit HG4 (1913); the newest is Unit JHG5 (1977).
When is it due to retire?
No retirement date has been filed for any operating unit at Port Edwards Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by residual oil.
How much does it spend on fuel?
Nothing in 2023 — its units in service (conventional hydroelectric) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Wisconsin energyAll facilities in the state→Pheasant Run Recycling and Disposal Facility7.2 MW operating capacity→ Du Bay7.2 MW operating capacity→ Elroy6.6 MW operating capacity→ Deer Track Park Landfill6.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming