POET Biorefining - Hudson

Hudson, Lincoln County, South Dakota · MISO · operated by POET Biorefining - Hudson · owned by Poet LLC

2023 · headline year
Fuel spend$10.6M2023 · estimate
Capacity in service3.6MW1 unit · gas
Net generation17.5GWh2023 · reported
CO₂ emitted99,741t2023 · reported to EPA · 2,419th highest of 6,030 in the US
Rank in South Dakota#47of 48 · by capacity · #8,368 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor56%2023

Location

Lincoln County · MISO · MRO

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.29 TBtu · reported · $10.6M est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 3.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 13.6Natural GasNatural Gas Steam Turbine2019Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Poet LLC · 100%
Operating utility
POET Biorefining - Hudson
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Other, Suppliers of CO2
EPA facility ID
1006030
Balancing authority
MISO
NERC region
MRO
EIA plant ID
63918

Common questions

How big is POET Biorefining - Hudson?
3.6 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Poet LLC (100%) and operated by POET Biorefining - Hudson, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2019.
When is it due to retire?
No retirement date has been filed for any operating unit at POET Biorefining - Hudson. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $10.6M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
99,741 t in 2023, reported to the EPA — the 2,419th highest of 6,030 US facilities that reported. Up from 83,836 t in 2011.

Related pages

South Dakota energyAll facilities in the state→Spearfish Hydro4.0 MW operating capacity→ POET Biorefining Mitchell, LLC3.9 MW operating capacity→ Pierre Solar1.0 MW operating capacity→ GCC Dacotah817,514 t CO₂ in 2023→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming