AMERICAN ENERGY ATLAS
Power·California

Plant No 1 Orange County

Orange County, California · CAISO · operated by Orange County Sanitation Dist

2023 · headline year
Fuel spend$1.18M2023 · estimate
Capacity in service7.5MW3 units · biomass
Net generation39.3GWh2023 · reported
Rank in California#803 (tied)of 1,713 · by capacity · #6,038 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor60%2023

Location

Orange County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

81% Landfill gas · 361,248 MMBtu · reported19% Natural gas · 86,357 MMBtu · reported · $1.18M est.

Landfill gas supplies 81% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 7.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN12.5BiogasOther Waste Biomass1993Operating
Unit GEN22.5BiogasOther Waste Biomass1993Operating
Unit GEN32.5BiogasOther Waste Biomass1993Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Orange County Sanitation Dist
Entity type
Political Subdivision
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
50696

Common questions

How big is Plant No 1 Orange County?
7.5 MW across 3 generating units in service.
Who owns and operates it?
Operated by Orange County Sanitation Dist, filed as political subdivision.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. Every operating unit came online in 1993.
When is it due to retire?
No retirement date has been filed for any operating unit at Plant No 1 Orange County. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.
How much does it spend on fuel?
An estimated $1.18M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Coram Energy LLC (ECT)7.5 MW operating capacity→ El Cajon Energy Storage7.5 MW operating capacity→ Sierra Pacific Sonora7.5 MW operating capacity→ Terra-Gen VG Wind LLC7.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming