AMERICAN ENERGY ATLAS
Power·New York

Plant No 1 Freeport

Nassau County, New York · NYISO · operated by Village of Freeport - (NY)

2023 · headline year
Fuel spend$6,7072023 · estimate
Capacity in service6.0MW2 units · oil
Net generation20MWh2023 · reported
Rank in New York#252 (tied)of 1,018 · by capacity · #6,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Nassau County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 304 MMBtu · reported · $6,707 est.

Reported fuel consumption, MMBtu · 2011–2023

02,0004,0006,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 6.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 33.1Distillate oilPetroleum Liquids1954Operating
Unit 22.9Distillate oilPetroleum Liquids1949Operating
Unit ENG133.0Landfill gasLandfill Gas2025Proposed
Unit 45.1Distillate oilPetroleum Liquids1964Retired 2021
Unit 12.1Distillate oilPetroleum Liquids1941Retired 2013

All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit ENG13new unit20253.0 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Village of Freeport - (NY)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
2678

Common questions

How big is Plant No 1 Freeport?
6.0 MW across 2 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Village of Freeport - (NY), filed as municipally owned utility.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1952. The oldest operating unit is Unit 2 (1949); the newest is Unit 3 (1954).
When is it due to retire?
No retirement date has been filed for any operating unit at Plant No 1 Freeport. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $6,707 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

New York energyAll facilities in the state→Orbit Bloom Fuel Cell6.0 MW operating capacity→ Oswego Falls East6.0 MW operating capacity→ Stuyvesant Falls6.0 MW operating capacity→ MM Albany Energy5.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming