AMERICAN ENERGY ATLAS
Industrial + power·Florida

Pinellas County Resource Recovery

ST. Petersburg, Pinellas County, Florida · FPC · operated by Reworld Projects, LLC · owned by County of Pinellas Florida

2023 · headline year
Capacity in service76.5MW2 units · waste
Net generation428GWh2023 · reported
CO₂ emitted737,405t2023 · reported to EPA · 754th highest of 6,030 in the US
Rank in Florida#75of 310 · by capacity · #2,829 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor64%2023

Location

Pinellas County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 8.82 TBtu · reported

CO₂ emitted, t · 2011–2023

0250,000500,000750,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 76.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN150.5Municipal solid wasteMunicipal Solid Waste1983Operating
Unit GEN226.0Municipal solid wasteMunicipal Solid Waste1986Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
County of Pinellas Florida · 100%
Operating utility
Reworld Projects, LLC
Entity type
Commercial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1001884
Balancing authority
FPC
NERC region
SERC
EIA plant ID
50884

Common questions

How big is Pinellas County Resource Recovery?
76.5 MW across 2 generating units in service.
Who owns and operates it?
Owned by County of Pinellas Florida (100%) and operated by Reworld Projects, LLC, filed as commercial.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. The oldest operating unit is Unit GEN1 (1983); the newest is Unit GEN2 (1986).
When is it due to retire?
No retirement date has been filed for any operating unit at Pinellas County Resource Recovery. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much CO₂ does it emit?
737,405 t in 2023, reported to the EPA — the 754th highest of 6,030 US facilities that reported. Up from 432,482 t in 2011.

Related pages

Florida energyAll facilities in the state→GEORGIA PACIFIC Palatka LLC79.8 MW operating capacity→ Citrus Solar Energy Center Hybrid78.5 MW operating capacity→ Bay Ranch Solar Power Plant74.9 MW operating capacity→ Bay Trail Solar Power Plant74.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming