Logan County, Illinois · MISO · operated by Repsol Renewables NA
Capacity shown is planned or not in service
A planned 202 MW onshore wind turbine project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit CPCW1 | 202.5 | Wind | Onshore Wind Turbine | 2026 | Proposed |
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit CPCW1 | new unit | 2026 | 202 MW |