Proposed

A planned 60.0 MW solar photovoltaic project, filed to come online in 2028.

Planned capacity60.0MW1 unit · not yet in service

Location

Campbell County · PJM · RFC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TC00160.0SolarSolar Photovoltaic2028Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit TC001new unit202860.0 MW

Ownership & operations

Operating utility
Pigeon Run Solar, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
64767

Common questions

How big is Pigeon Run Solar Project?
60.0 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Pigeon Run Solar, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
What does it run on?
Solar Photovoltaic (60.0 MW).

Related pages

Virginia energyAll facilities in the state→Petersburg City LandfillIndustrial facility→ Philpott LakePower facility→ Pineside SolarPower facility→ Ponton Diesel Generating FacilityPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming