AMERICAN ENERGY ATLAS
Industrial + power·North Carolina

Piedmont Landfill and Recycling Center

Kernersville, Forsyth County, North Carolina · DUK · operated by WM Renewable Energy LLC

last reported to the EPA in 2014

2023 · headline year
Capacity in service1.6MW2 units · biomass · 1 more on standby or out of service
Net generation10GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2014
Rank in North Carolina#867 (tied)of 908 · by capacity · #11,073 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Forsyth County · DUK · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 129,207 MMBtu · reported

CO₂ emitted, t · 2011–14

03,0006,0009,000201120122014
Reported (through 2014)

Generating units

3 of 3 shown · 1.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN10.8Landfill gasLandfill Gas2011Operating
Unit GEN20.8Landfill gasLandfill Gas2011Out of service
Unit GEN30.8Landfill gasLandfill Gas2011Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007456
Balancing authority
DUK
NERC region
SERC
EIA plant ID
57169

Common questions

How big is Piedmont Landfill and Recycling Center?
1.6 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2011. Every operating unit came online in 2011.
When is it due to retire?
No retirement date has been filed for any operating unit at Piedmont Landfill and Recycling Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

North Carolina energyAll facilities in the state→Metropolitan Sewerage District1.6 MW operating capacity→ Page Solar1.6 MW operating capacity→ South Atlantic Services Solar Farm I1.6 MW operating capacity→ Davidson V1.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming