Lamar County, Georgia · SOCO · operated by Piedmont Green Power LLC
2023 · headline year
Capacity in service60.0MW1 unit · biomass
Net generation390GWh2023 · reported
Rank in Georgia#90 (tied)of 247 · by capacity · #3,236 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor74%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Biomass · 4.87 TBtu · reported
Reported fuel consumption, TBtu · 2013–2023
Reported (through 2023)
Generating units
1 of 1 shown · 60.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
60.0
Wood
Wood/Wood Waste Biomass
2013
Operating
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Operated by Piedmont Green Power LLC, filed as independent power producer.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Piedmont Green Power. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?