Fuel spend$2.82M2023 · estimate
Capacity in service13.0MW1 unit · gas
Net generation13.8GWh2023 · reported
CO₂ emitted31,412t2023 · reported to EPA · 4,640th highest of 6,030 in the US
Rank in Virginia#138 (tied)of 230 · by capacity · #5,079 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor12%2023
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Philip Morris USA - Park 500?
13.0 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by
Altria Group Inc (100%) and operated by Philip Morris USA - Park 500, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1983.
When is it due to retire?
No retirement date has been filed for any operating unit at Philip Morris USA - Park 500. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $2.82M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
31,412 t in 2023, reported to the EPA — the 4,640th highest of 6,030 US facilities that reported. Down from 123,714 t in 2011.