AMERICAN ENERGY ATLAS
Power·Alaska

Petersburg

Wrangell Petersburg, Alaska · operated by Petersburg Borough - (AK)

2023 · headline year
Capacity in service14.7MW8 units · oil + hydro
Rank in Alaska#40of 142 · by capacity · #4,969 (tied) of 13,147 US
Reported suppliersNot reported2023

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 7,610 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

10 of 10 shown · 14.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit IC12.6Distillate oilPetroleum Liquids1972Operating
Unit IC62.6Distillate oilPetroleum Liquids1993Operating
Unit IC72.6Distillate oilPetroleum Liquids2001Operating
Unit IC82.5Distillate oilPetroleum Liquids2012Operating
Unit 41.8WaterConventional Hydroelectric2023Operating
Unit IC31.2Distillate oilPetroleum Liquids1965Operating
Unit IC50.8Distillate oilPetroleum Liquids1979Operating
Unit IC40.6Distillate oilPetroleum Liquids1979Operating
Unit 31.6WaterConventional Hydroelectric1954Retired 2023
Unit IC20.3Distillate oilPetroleum Liquids1972Retired 2017

All 10 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Petersburg Borough - (AK)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
EIA plant ID
91

Common questions

How big is Petersburg?
14.7 MW across 8 generating units in service — 12.9 MW of oil and 1.8 MW of hydro. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Petersburg Borough - (AK), filed as municipally owned utility.
How old is it?
The capacity-weighted average megawatt here came online in 1994. The oldest operating unit is Unit IC3 (1965); the newest is Unit 4 (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Petersburg. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.

Related pages

Alaska energyAll facilities in the state→Blue Lake Hydro15.9 MW operating capacity→ Seward (AK)15.6 MW operating capacity→ Lake Dorothy Hydroelectric Project14.3 MW operating capacity→ Solomon Gulch12.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming