Hardin County, Texas · MISO · operated by Strata Clean Energy
Capacity shown is planned or not in service
A planned 115 MW solar photovoltaic project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 11104 | 115.0 | Solar | Solar Photovoltaic | 2026 | Proposed |
1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 11104 | new unit | 2026 | 115 MW |