AMERICAN ENERGY ATLAS
Power·Missouri

Peno Creek Energy Center

Bowling Green, Pike County, Missouri · MISO · operated by Union Electric Co - (MO) · owned by Ameren Corp

2023 · headline year
Reported fuel cost$9.5M2023 · reported deliveries
Capacity in service240MW4 units · gas
Net generation141GWh2023 · reported
CO₂ emitted85,127t2023 · reported to EPA · 2,675th highest of 6,030 in the US
Rank in Missouri#26of 119 · by capacity · #1,241 (tied) of 13,147 US
Reported suppliers22023 · 24 deliveries
Capacity factor7%2023

Location

Pike County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.56 TBtu · reported

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 240 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GT160.0Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit GT260.0Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit GT360.0Natural GasNatural Gas Fired Combustion Turbine2002Operating
Unit GT460.0Natural GasNatural Gas Fired Combustion Turbine2002Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Panhandle Eastern PipelineNatural gas1.56n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 161 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Ameren Corp · 100%
Operating utility
Union Electric Co - (MO)
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000151
Balancing authority
MISO
NERC region
SERC
Gas pipeline
Panhandle Eastern Pipeline Company
EIA plant ID
7964

Common questions

How big is Peno Creek Energy Center?
240 MW across 4 generating units in service.
Who owns and operates it?
Owned by Ameren Corp (100%) and operated by Union Electric Co - (MO), filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. Every operating unit came online in 2002.
When is it due to retire?
No retirement date has been filed for any operating unit at Peno Creek Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $9.5M in 2023.
How much CO₂ does it emit?
85,127 t in 2023, reported to the EPA — the 2,675th highest of 6,030 US facilities that reported. Up from 59,019 t in 2011.

Related pages

Missouri energyAll facilities in the state→Sikeston261 MW operating capacity→ Clear Creek Wind242 MW operating capacity→ White Cloud Wind Project, LLC236 MW operating capacity→ Osage Dam208 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming