AMERICAN ENERGY ATLAS
Power·Georgia

PCA-Valdosta Mill

Lowndes County, Georgia · SOCO · operated by PCA-Valdosta Mill

2023 · headline year
Capacity in service69.9MW3 units · biomass
Net generation307GWh2023 · reported
Rank in Georgia#84of 247 · by capacity · #3,092 of 13,147 US
Reported suppliersNot reported2023
Capacity factor50%2023

Location

Lowndes County · SOCO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

96% Black liquor · 11.7 TBtu · reported4% Natural gas · 0.453 TBtu · reported

Black liquor supplies 96% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2015–23

051015201520192023
Reported (through 2023)

Generating units

3 of 3 shown · 69.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TG352.3Black liquorWood/Wood Waste Biomass2011Operating
Unit TG110.1WoodWood/Wood Waste Biomass1954Operating
Unit TG27.5WoodWood/Wood Waste Biomass1954Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
PCA-Valdosta Mill
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
SOCO
NERC region
SERC
EIA plant ID
60084

Common questions

How big is PCA-Valdosta Mill?
69.9 MW across 3 generating units in service.
Who owns and operates it?
Operated by PCA-Valdosta Mill, filed as industrial.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1997. The oldest operating units are Unit TG1 and Unit TG2 (1954); the newest is Unit TG3 (2011).
When is it due to retire?
No retirement date has been filed for any operating unit at PCA-Valdosta Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned black liquor and natural gas.

Related pages

Georgia energyAll facilities in the state→Hobnail Solar70.0 MW operating capacity→ SR Cedar Springs, LLC70.0 MW operating capacity→ Rayonier Performance Fibers LLC, Jesup Mill69.5 MW operating capacity→ SR Perry68.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming