Kern County, California · CAISO · operated by Pastoria Solar Energy Company, LLC
Capacity shown is planned or not in service
A planned 185 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit CPP01 | 105.2 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit GEN1 | 80.0 | Storage | Batteries | 2026 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit CPP01 | new unit | 2025 | 105 MW |
| Unit GEN1 | new unit | 2026 | 80.0 MW |