San Francisco County, California · CAISO · operated by University of California-San Francisco
2023 · headline year
Capacity in service13.4MW3 units · gas
Net generation68.5GWh2023 · reported
Rank in California#706 (tied)of 1,713 · by capacity · #5,057 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor58%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 944,318 MMBtu · reported
Reported fuel consumption, TBtu · 2012–2023
Reported (through 2023)
Generating units
3 of 3 shown · 13.4 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GTG1
4.8
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit GTG2
4.8
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit STG1
3.8
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
Operated by University of California-San Francisco, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. Every operating unit came online in 1996.
When is it due to retire?
No retirement date has been filed for any operating unit at Parnassus Central Utility Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?