Racine County, Wisconsin · MISO · operated by Wisconsin Electric Power Co
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit PSLR1 | 200.0 | Solar | Solar Photovoltaic | 2024 | Operating |
| Unit PSLR2 | 100.0 | Storage | Batteries | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit PSLR2 | new unit | 2025 | 100 MW |