Painesville, Lake County, Ohio · PJM · operated by City of Painesville · owned by City of Painesville Ohio
2023 · headline year
Capacity in service40.5MW3 units · coal + oil · 2 more on standby or out of service
Net generation749MWh2023 · reported
CO₂ emitted1,607t2023 · reported to EPA · 5,958th highest of 6,030 in the US
Rank in Ohio#70of 189 · by capacity · #3,741 (tied) of 13,147 US
Reported suppliers42023 · 41 deliveries
Location
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 40.5 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 7
22.0
Bituminous coal
Conventional Steam Coal
1990
Operating
Unit 5
16.5
Bituminous coal
Conventional Steam Coal
1965
Operating
Unit 3
7.5
Bituminous coal
Conventional Steam Coal
1953
Standby
Unit ST2
7.5
Bituminous coal
Conventional Steam Coal
1949
Standby
Unit WPCP1
2.0
Distillate oil
Petroleum Liquids
2010
Operating
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 441 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
40.5 MW across 3 generating units in service — 38.5 MW of coal and 2.0 MW of oil. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by City of Painesville Ohio (100%) and operated by City of Painesville, filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1981. The oldest operating unit is Unit 5 (1965); the newest is Unit WPCP1 (2010).
When is it due to retire?
No retirement date has been filed for any operating unit at Painesville Municipal Electric Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by bituminous coal and distillate oil. Coal delivered in 2023 came from 2 coal suppliers, from mines in Ohio — principally Stonecreek Mine. Other fuels (natural gas and oil & petroleum) came from 2 suppliers in 2023.
How much CO₂ does it emit?
1,607 t in 2023, reported to the EPA — the 5,958th highest of 6,030 US facilities that reported. Down from 111,374 t in 2011.