AMERICAN ENERGY ATLAS
Power·Kentucky

Paddys Run

Louisville, Jefferson County, Kentucky · LGEE · operated by Louisville Gas & Electric Co · owned by PPL Corp

2023 · headline year
Reported fuel cost$3.99M2023 · reported deliveries
Capacity in service211MW2 units · gas
Net generation27.1GWh2023 · reported
CO₂ emitted15,913t2023 · reported to EPA · 5,574th highest of 6,030 in the US
Rank in Kentucky#20of 58 · by capacity · #1,343 (tied) of 13,147 US
Reported suppliers12023 · 11 deliveries
Capacity factor1%2023

Location

Jefferson County · LGEE · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 303,496 MMBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 211 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 13178.0Natural GasNatural Gas Fired Combustion Turbine2001Operating
Unit 1232.6Natural GasNatural Gas Fired Combustion Turbine1968Operating
Unit 1116.0Natural GasNatural Gas Fired Combustion Turbine1968Retired 2021

All 3 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
Texas GasNatural gas307,980n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 146 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
PPL Corp
Operating utility
Louisville Gas & Electric Co
Jointly held units
Kentucky Utilities Co 47% of 1 unit
Louisville Gas & Electric Co 53% of 1 unit
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001585
Balancing authority
LGEE
NERC region
SERC
Gas pipeline
Texas Gas Transmission LLC
EIA plant ID
1366

Common questions

How big is Paddys Run?
211 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by PPL Corp and operated by Louisville Gas & Electric Co, filed as investor-owned utility. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
LGEE (Louisville Gas and Electric Company and Kentucky Utilities Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. The oldest operating unit is Unit 12 (1968); the newest is Unit 13 (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at Paddys Run. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $3.99M in 2023.
How much CO₂ does it emit?
15,913 t in 2023, reported to the EPA — the 5,574th highest of 6,030 US facilities that reported. Down from 16,203 t in 2011.

Related pages

Kentucky energyAll facilities in the state→Marshall258 MW operating capacity→ Kentucky Dam219 MW operating capacity→ SR Russellville173 MW operating capacity→ Barkley130 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming